The Contract was completed for ERG. This was a joint venture project completed along with William & Henry Alexander (Civil Engineering) Ltd. Evishagaran consists of 13 turbines, with a total installed capacity of up to 46.8 MW and is able to produce 178.8 GWh of electricity per year. This site has capacity for powering up to 26,000 homes and reducing Co2 emissions by 77,850 tonnes.
The works completed as part of the Design & Build Contract were as follows:
Installation of 13 Turbine foundations
Installation of 13 Hard stand areas including blade laydown areas and crane assist pads