Cam Burn Wind Farm

The Contract was completed for ABO Wind N.I. Ltd.  This project was completed to facilitate a Material Start to the development of Cam Burn Wind Farm.

The works completed as part of the Design & Build Contract were as follows:

  • Installation of bell-mount area at entrance
  • Installation of Hard stand areas
  • Installation of 3 culverts along the access roads
  • Installation of 840 meters of Access tracks
  • Installation of Substation building base
  • Installation of SuDS features throughout the site
  • Installation of Temporary Compound
  • Installation of stock-proof fencing and gates for landowner accommodation works
  • Installation & Protection of a High Pressure Gas-main Transmission Line
  • Installation of attenuation ponds
  • Installation of Environment impact mitigations measures